Ordnance Wharf

Residential

Project Title: Ordnance Wharf

Client: Queensway Quay Development

Project Value: £5m

Hulley contact: Gordon McInnes

Continuing the successful theme of the Cormorant Wharf Development, Ordnance Wharf consisted of a number of phases increasing in size, providing a total of 28 Apartments over three buildings.

Constructed on an existing redundant MoD Dockside overlooking the Cormorant Wharf, these prestigious Apartments form an extension to the previously constructed Town Houses and low rise Apartments that make up Phases One and Two of the development.

Phase Three afforded a private swimming pool and lounge terrace at the furthest end of the Wharf. Below the building car parking is provided with mechanical smoke and fume ventilation.

Using the same Designers as the previous phases, the Client benefited from the experience and synergy of an established Design Team. The introduction of a new Construction Contractor provided considerable time and financial benefits, without compromising the high quality required of the project.

The use of uPVC pipework throughout the installation provided saving on the hot and cold water installation and ensured cost in use best value was obtained.


Back to list (Residential)



This website contains just a handful of Residential projects H&K have been involved with. To receive our complete Residential Project Portfolio, please click here

 
site map | links | contact us | legal ©2007 Hulley & Kirkwood Consulting Engineers Limited